Tags

Multihazard

Technical Assistance

The Resilient by Design/Bay Area Challenge (2017-2018) was a collaborative design process showcasing innovative new ways to strengthen the Bay Area's resilience to sea level rise, flooding, severe

This is the Specific Plan adopted by the City of El Cerrito in 2014 for its San Pablo Avenue Specific Plan Priority Development Area (PDA). For information about the Specific Plan history, process and

The " Proposed Funding Pathways for Adaptation to Climate Change in California" report identifies four proposed funding pathways to address pressing climate resilience needs in California, with a

The Specific Plan was adopted by the City of Berkeley for its Adeline Corridor Priority Development Area (PDA). The Specific Plan provides goals, policies, and implementation strategies for the Plan

The Santa Rosa Downtown Station Area Specific Plan (DSASP) is an example of a Priority Development Area (PDA) plan. DSASP seeks to guide the intensification of an energetic commercial enterprise and

Completed in June 2020, the State Route 37 (SR 37) Public Access Scoping Report explores the role SR 37 plays as a vital east-west connection for communities not currently served by public

The Resilient By Design: Bay Area Challenge (The Book) compendium (2017-2018) includes: An overview of the process from Launch through Collaborative Research and Design) Final design concepts from

The Community Development Innovation Review offers strategies to address climate change risk in low- and moderate-income communities. It contains multiple perspectives on equitable community planning

The Fourth Climate Change Assessment: San Francisco Bay Area Region Report summarizes ongoing efforts in the Bay Area to understand how these potential impacts to our economy, utilities and natural

The Building Resilience: Four Ways to Find Resources for Protection and Prevention graphic presentation provides strategies for raising the financial resources needed to broadly adapt to climate